Residential Solar Interconnection Application
60–90 days of email, replaced
A complete residential interconnection intake: system details, one-line diagram and COI uploads, parallel engineering and billing review, and installer status access.
Panels, subscriptions, and the waitlist that runs itself
Track your array's capacity in the template's database; the subscription form checks remaining blocks in real time. When capacity hits zero the form flips to waitlist mode automatically — no manual gate-keeping, no overselling. When a subscriber drops, the workflow offers the block to the next waitlisted member with a time-limited claim link.
Save adds this template to your workspace. New to SaaS eForms? Your free trial starts when you save. Customize everything once it's in.
60–90 days of email, replaced
A complete residential interconnection intake: system details, one-line diagram and COI uploads, parallel engineering and billing review, and installer status access.
Three-phase, higher stakes, same clarity
Commercial-scale interconnection with capacity-based branching, study-required routing, and multi-party document collection from developers and engineers.
From interest to enrolled device
A BYOT demand response enrollment that verifies device eligibility, captures program consent, and hands enrollment data to your DR platform.
A full rebate program in one save
The whole rebate stack in one bundle: application form, review workflow, budget tracker, notifications, inspection form, and reporting — pre-connected.
Free with any plan · Sets up in 30 min
Community Solar Subscription & Waitlist
Free with any plan · Sets up in 30 min